
Our Projects
Concrete achievements for lasting impact
100-Hectare Agricultural Project
Our flagship intensive farming and livestock project on 100 hectares represents KMK GROUP's ambition for agricultural development.

Agriculture
Food crops (cassava, yam, corn) and cash crops on 60 hectares with drip irrigation system.

Livestock
Cattle and poultry farming (broilers, laying hens) on 30 hectares. Cold chain and slaughterhouse to health standards.

Processing
Agricultural and livestock processing unit to create added value and reduce post-harvest losses.
Construction Projects
KMK GROUP is developing ambitious real estate and infrastructure projects to meet the growing needs of the region.

Hotel R+2 — 50 Rooms
Construction of a R+2 hotel with 50 rooms in the interior of Côte d'Ivoire. Estimated budget between 510 and 790 million FCFA. Includes structural work, room equipment (air conditioning, TV, bathrooms), restaurant, reception and conference room.

R+4 Medical Clinic
Construction of a R+4 clinic in Abidjan. Estimated budget between 645 million and 1.25 billion FCFA. Includes structural work, biomedical equipment (imaging, operating room, laboratory), generator, centralised air conditioning and medical furniture.

Large Supermarket
Construction of a large modern supermarket with parking, offering a wide range of food and non-food products.
Investment Table
| N° | Désignations | Montant (F CFA) |
|---|---|---|
| A | Forage | 12 000 000 |
| B | Agriculture (crops) | 25 000 000 |
| C | Processing | 12 000 000 |
| D1 | Pisciculture | 25 000 000 |
| D2 | Poulailler | 25 000 000 |
| D3 | Caprin / Bovin / Aulacodes / Etc | 25 000 000 |
| E | Apiculture | 500 000 |
| F | Conteneurs Frigorifiques | 21 000 000 |
| G | Bureaux & Logements / Magasins | 30 000 000 |
| H | Espace Environnemental / Écologique | 30 000 000 |
| TOTAL | 205 500 000 |